23.1The plant occupies territory for about 79 thousand square meters. Also manufacturing areas compound 30 thousand square meters, 12.25 thousand square meters (41%) of them is free. Storagepremisescompound 7 thousandsquaremeters.

 

 

 

 

 

Manufacturingareasqualification

 

Name

area (th.sq.М)

free

the main case

10000

8100

attach to the main case

3000

3000

case № 4

3000

3000

case № 5

3570

3570

case № 7

2300

2300

case № 9

850

850

supplementary case

2500

-

 

The plant certified on ISO 9001-2008. The certificate was got on 29th of August in 2009. The certification was held by TUV Rheinland Inter Cert Company.

1. Machinery

The plant is equipped with the following machines

1.01. Technological equipment in amount of 25 units on repairing of engine models as ZMZ.

1.02. Squeezers:

- Double action squeeze with effort of 1000 tone – 2 units                             22.1

- Squeezer with force of 800 tone – 2 units

- Squeezer with force of 500 tone – 2 units

- Squeezer with force of 400 tone – 1 unit

- Squeezer with force of 315 tone – 4 units

- Squeezer with force of 250 tone – 2 units

- Crooked thorn squeezer with force of 40-160 tone – 12 units

- Hydraulic squeezer with force of 630 tone – 1 unit

- Hydraulic squeezer with force of 250 tone – 2 ед.

- Gantry crane 20 tone – 1 unit

- Bridge crane 12 т – 2 units

- Plate guillotine shears – 5 units

24.11.03. Turning and capstan machines – 58 units   25.1

1.04. Capstan automat with NC – 3 units

1.05. Drilling machines – 59 units

1.06. Grinding machines – 57 units

- Flatly grinding

- Roundly grinding

- Butt-end grinding

1.07. Milling machines – 22 units

1.08. Welding equipment:

- Semi-automatic arc welding in midst CO2 (carbonic oxide) –17 units

- Pendant machines of contact welding – 85 units

- Spot welding machines – 16 units

1.09. Quenching electric furnaces – 8 ед.

1.10. Salt baths for hardening details – 8 units

1.11. Flanging machine – 1 unit

1.12. Plate bending machine – 1 unit

1.13. Automatic injection machines V from 250 to 700 см3 – 4 units

1.14. Vacuum forming machines – 2 units

1.15. Setting vacuum deposition – 1 unit

1.16. Woodworking equipment – 7 units

1.17. Load-lifting mechanisms – 90 units

1.18. Stampsandpressforms– 2600 pieces

There is import chamber for painting and drying of body parts of cars.

2. Availablepower.

2.1. Power supply is carried out by 3 PTL-6 kilowatt cables from regional substation. Total capacity of power transformers are 5260 kilowatts. Power reserve is 2000 kilowatts.

2.2. Heat supply is carried out by the boiler-house of a plant with the general productivity of 28 t/hour of steam. It has been conducting works on transform into the off line heating of cases since 2008.

 

2.3. Compressed air supply is carried out by the help of two compressors with productivity of 60 m3 a minute.

2.4. Water supply is carried out by the city water pipe with productivity of 500 m3 in an hour. Turnaround water supply – 250m3 in a day.

2.5. Gas supply is carried out by the city gas pipeline of average pressure – 11,4 thousand in a day.

3. Transport

There is a transportation site at the plant which is providing transportation of product of own manufacture. There are drill roads in very good condition at the plant area and are near to the cargo railway station (6 km).

4. Offer

Theenterpriseisabletoorganizeonownfloorspaces:

- Production of spare parts of cars, assembly manufacture;

- Production of spot electrodes and tips from alloy of dispersal strengthened composite materials;

- Dealer services on car sale;

- Creation of trade-expo center complex and technical service of cars